Inventra S³

Manufacturing

Machining, surface finishing, cabling and integration happen in one building, which is what makes a four-week configured delivery possible.

  • 5-axis simultaneous CNC milling
  • 4+1 axis CNC turning
  • Coating and painting
  • Electronics, cabling and integration

Where this work happens

Production, Integration, Test and Qualification Centre

Ahi Evran St. 134, 06374 Yenimahalle, Ankara

Machining, coating, cabling, assembly, dimensional inspection and environmental testing. A part is cut, measured and tested in the same building, so a dimensional or environmental problem is found here rather than at the customer.

Half-assembled climate module on a workbench with a cabin shell beside it

Test and Qualification

Designed against published methods

Systems are designed to MIL-STD-810G environmental conditions, MIL-STD-461E for electromagnetic compatibility and MIL-DTL-38999 for electrical connections. Temperature and humidity testing is done in our own chambers; the table below lists the methods a system is designed against.

  • EnvironmentalMIL-STD-810G
  • EMI/EMCMIL-STD-461E
  • Electrical connectionsMIL-DTL-38999
ConditionMethod
Operating temperatureMethod 501.5 Proc. II +60 °C (+85 °C optional) · Method 502.5 Proc. II −22 °C (−30 °C optional)
Storage temperatureMethod 501.5 Proc. I +70 °C · Method 502.5 Proc. I −32 °C
Solar loadMethod 501.5 Proc. II, operating, +55 °C
VibrationMethod 514.6 Proc. I, Category 4, Figure 514.6C-1
RainMethod 506.5 Proc. I

Need a specification traced to its source?

Ask for the analysis or the qualification method behind any published figure.