Manufacturing
Machining, surface finishing, cabling and integration happen in one building, which is what makes a four-week configured delivery possible.
- 5-axis simultaneous CNC milling
- 4+1 axis CNC turning
- Coating and painting
- Electronics, cabling and integration
Where this work happens
Production, Integration, Test and Qualification Centre
Ahi Evran St. 134, 06374 Yenimahalle, Ankara
Machining, coating, cabling, assembly, dimensional inspection and environmental testing. A part is cut, measured and tested in the same building, so a dimensional or environmental problem is found here rather than at the customer.

Test and Qualification
Designed against published methods
Systems are designed to MIL-STD-810G environmental conditions, MIL-STD-461E for electromagnetic compatibility and MIL-DTL-38999 for electrical connections. Temperature and humidity testing is done in our own chambers; the table below lists the methods a system is designed against.
- EnvironmentalMIL-STD-810G
- EMI/EMCMIL-STD-461E
- Electrical connectionsMIL-DTL-38999
| Condition | Method |
|---|---|
| Operating temperature | Method 501.5 Proc. II +60 °C (+85 °C optional) · Method 502.5 Proc. II −22 °C (−30 °C optional) |
| Storage temperature | Method 501.5 Proc. I +70 °C · Method 502.5 Proc. I −32 °C |
| Solar load | Method 501.5 Proc. II, operating, +55 °C |
| Vibration | Method 514.6 Proc. I, Category 4, Figure 514.6C-1 |
| Rain | Method 506.5 Proc. I |
Need a specification traced to its source?
Ask for the analysis or the qualification method behind any published figure.